Thought this should be posted before Monday's commute

Views: 12559

Replies are closed for this discussion.

Replies to This Discussion

It might take that much. ;)

h' 1.0 said:

Rumor has it they dumped all the rubble removed from the LFP into the Sacramento/Marshall Blvd PBL to try to make it more rideable.

The LFP is back up to pre-storm condition north of the museum campus with the exception of the area at the Ohio beach junction. This area was already under construction for the Chicago River flyover. 

RSS

© 2008-2016   The Chainlink Community, L.L.C.   Powered by

Disclaimer  |  Report an Issue  |  Terms of Service